For the first time in our country in railway projects, within the scope of TUBITAK 1007 Program, in order to nationalize the signaling systems obtained from abroad; TCDD, TÜBİTAK BİLGEM and İTÜ National Railway Signalization Project (UDSP) have been successfully completed and prototype work has been completed and commissioned at Mithatpaşa (Adapazarı) station.
●● Within the scope of the project, three main components have been developed: the interlocking system (signaling system decision center), traffic control center and hardware simulator, which are considered as the most important elements of the signaling systems.
●● It is aimed to expand the National Railway Signaling System throughout the country and manufacturing works are continuing in national signaling between Afyon-Denizli-Isparta / Burdur and Denizli-Ortaklar. Upon completion of this line, for the first time, a signal project will be made on a main line section of our network, all of which have national design and design.
●● Within the scope of the project; Horsunlu-Buharkent stations were commissioned on Denizli-Ortaklar line. National signal interlocking systems are carried out by TÜBİTAK and roadside signaling works are carried out by TCDD.
Be the first to comment