Mersin Metro Project and Mersin Metro Map

Grand National Assembly of Turkey (Parliament), the Planning and Budget Committee Chairman Lutfi Elvan's Mersin subway to say that President Recep Tayyip Erdogan gave approval for the receipt of the investment program, has created great excitement in Mersin citizens.

Construction of Mersin Metropolitan Municipality will be started in a short period of time and will provide a fundamental solution to the traffic problem of the city, which will create improvements in public transportation 'Mersin Metro 4 Line will be built. The first line to be constructed will consist of 1 15 stations

262 THOUSAND PASSENGER CAPACITY

Mersin Metro Line will be constructed with 1's 4 vehicles directory with 1080 passenger / voyage capacity at one time and will be 20 km double line railway, 15 station and 2600 car parking. 'Mersin Metro Line 1'in daily passenger capacity of the total 262 thousand 231 passengers / day will be.

FIRST STAGE 80 METRO VEHICLE

Metro Line 1 Mersin in Turkey will be one of the most efficient and profitable lines. Cumhuriyet-Soli-Mezitli-Babylon-Fair-Marina-High Schools-Forum-Türk Telekom-Tulumba-Free Children Park-Gar-Üçocak-Mersin Metropolitan Municipality New Service Building and Free Zone. In the first stage, the number of subway vehicles required will serve with the 80 vehicle, including backups, and 2029 additional vehicle will be added in 4 and 2036 additional vehicle will be added in 12.

Within the scope of the Master Plan of Transportation, the Mersin Metro Line 1 will solve the traffic problem, which is one of the problems of Mersin, for many years.

Mersin Metro Line 1, which will be an innovative subway for Mersin, will provide a versatile functional, low-cost, fast-to-construct, aesthetic in urban sense and a secure service in terms of transportation. All of the stations will be located underground and will only be built semi-open by a method that will be applied for the first time in the world.

myrtle metro line
myrtle metro line

MERSIN METRO LINE 1 STATIONS AND STOPS

1-Free Zone
2-Greater Municipality of Mersin
3-Three January
4-Gara
5-Free Playground
6-Tulumba
7-Türk Telekom
8-Forum
9-High School
10-Marina
11-Fair
12-Babylon
13-Akdeniz
14-Solin
15-Republic

In the station design criteria, the main objective of the design is to integrate the transportation system with the special transportation activities with wheels, to plan the upper floor of the metro line as a car park along the line route, and to transfer the vehicle traffic in the city center to the subway with the parking solutions at the top of some stations.

Construction of a semi-open private system, evaluating the stations as urban living areas other than transportation, fast buffet, bookstore, fast food, rest and so on. planning of commercial units in functionality, creation of green spaces and use of openings for natural ventilation.

According to the model assignment results of the year 2030, the total number of daily public transport journeys 921.655; the total number of public transport passengers per day 1.509.491; The total daily main backbone public transport lines are expected to be as many as the number of passengers 729.561 and the total number of passengers with the system of wheeled tires daily.

Be the first to comment

Leave a response

Your email address will not be published.


*